2013년 6월 2일 일요일

생산운영관리 동원 제조(영문)

생산운영관리 동원 제조(영문)
[생산운영관리] 동원 제조(영문).pptx


목차
1.-Introduction
2.-Fisheries
3.-Manufacture
-Work Station(CH.4)
-P-Chart (CH.6)
4.-Distribution
-Loex&3PL
-Centroid (CH.9)
5.-Conclusion



본문
Dongyoung Cold Plaza
-Size : 1,500-pyeong

Factory facilities
-80,000tons of
refrigerating facilities
-12,000-ton cold store

☞Capable of processing
up to 50 tons/year

Total Time = 160 sec
About 100 tuna cans can be produced
per tuna
→ Assume a whole tuna as a unit



Total Time = 160 seconds

The factory is operated 10 hours/day
418 tunas/day to meet the demand forecast

Cycle Time = Production Time/day
Required output/day

= 60sec * 600 min
418 tunas
= 86.12 sec

N = Sum of task time (T)
Cycle time (C)

=160sec
86.12sec
= 1.8
≒ 2 stations

Efficiency
= Sum of task time
Actual # of workstation * Cycle time

= 160 / 2*86.12
=92.89%



Delivery Service
Decrease distribution cost
Maximize delivery effectiveness
Minimize delivery time


Distributing & Manufacturing
Service
Manages productivity
Stickers/tags on the finished
imported goods


Transport Service
Developed advanced transportation system
through the best quality trucks


Distribution Consulting Service
Constructed DW’s Centroid
Established efficiency in distribution
management operation

Central Operation Service
Manages inventory service system
Controls temperature for storage & delivery trucks
Supervise warehouse & shipment


본문내용
6)
-Distribution
Loex&3PL
Centroid (CH.9)
-Conclusion
PAGE:4
P-
CHARTS
WORK
STATION
FISHERIES
INTRO
CENTROID
CONCLUSION
Company Information
3PL
LOEX
PAGE:5
“참치도 동원이죠”
Who’s Leader In Tuna Market?
P-
CHARTS
WORK
STATION
FISHERIES
INTRO
CENTROID
CONCLUSION
Over 70 % Market Share
3PL
LOEX
PAGE:6
DW’s Products
Symbol of Dongwon!
P-
CHARTS
WORK
STATION
FISHERIES
INTRO
CENTROID
CONCLUSION

3PL
LO
 

댓글 없음:

댓글 쓰기